| | 1995 The following lists the meetings and presentations arranged in 1995. Where papers are marked with an asterisk (*) the author(s)/presenter did not provide complete papers. The Aungier Award recipient can only provide a short resume, as required by the Institution of Chemical Engineers, before completion of his research.
19th January - Purification
- * Clinsulf DO for Sulphur Recovery from H2S containing Gas.
by M Heisel, F J Marold and M Gwinner, Linde AG. Presented by: J Kunkel.
- Stretford Desulphurisation of Natural Gas for Power Generation.
- by D L Jacobi and C W Sweeney, British Gas plc and M Kirk and J Frost, KCC Process Equipment Ltd.
- Sulfur Recovery with Reduced Emissions, Low Capital Investment and Hydrogen Co-production. by G Towler, UMlST and S Lynn, Univ. of California, Berkeley
23rd March – I: Aungier Award Paper
II: Steady State and Dynamic Simulation of Gas Processing - Present and Future.
- * Design and Analysis of Split-Loop Absorber-Stripper Systems for Acid Gas Removal. by H K Shethna and G Towler, Department of Process Integration, U MIST
- Dynamic Simulation for the Gas Processing Industry. by P N Hoggett, Trident Consultants Ltd.
- Applications of Dynamic Simulation.
by 0 Broquetas, Hyprotech S.L.
28th September - Production and Processing Difficult or Marginal Fields
The North Morecambe Platform. by R G Guy, Kværner H&G Offshore Ltd.
The North Morecambe Onshore Terminal. by M Mayer and T Crowe, British Gas plc
Development of a HT/HP satellite field by use of NNMI. by R Høgåsen, Aker Offshore Partner
Future Development of Gas Production from the Haltenbanken Area. by E Aarebrot, Statoil and O. Støve, Saga Petroleum
The Application of the Wellcom System to Enhance Production from Difficult Fields. by M M Sarshar, Caltec UK
Improved Process Equipment and Technology Requirements for Difficult Offshore Fields. by S R Davies and D M Jepson, AEA Technology
Reliability Based Cost/Benefit Analysis used in the Britannia Development. by P R Dayies and S J Haycock, Britannia Operator Ltd.
Gas Reception Facility Uses Modern Solvents to Reduce Emissions. by A Pelekanou, The Ralph M Parsons Co. Ltd. and C M Vaughan, BI-IP Petroleum Ltd.
23rd November - Revamps
- Capacity Expansion of Two Ethane Recovery Units at QAPCO, Umrn Said, Qatar.
by G Heck and J P Laugier, Technip
- Revamping an LNG Plant to Process a Contaminated Feed Stream. by P G Kauders, Bechtel Limited. Presented by: D Slocurn
- Cost Effective Use of Photogrammetry in Revamps.
by S W Campbell, Costain Oil, Gas and Process Ltd.. Presented by: J C Parr |