A Floating GTL Solution for Stranded Gas
Peter Alderton, Foster Wheeler Energy Limited, Reading, UK
Click here to read more or leave a comment.
CO2 Capture – A Study for Major Operating Plants
David Weeks, M W Kellogg
Click here to read more or leave a comment.
Conceptual Optimisation of GT Driven Compressor Trains
Manfred Ramdohr, Siemens, Germany
Click here to read more or leave a comment.
Fluor Solvent Carbon Capture Technology
John Mak, Fluor Energy and Chemicals
Click here to read more or leave a comment.
Integration of Models for Power Plant and CO2 Capture
Christopher Ness, Bryan Research and Engineering, USA and Jonas Alin, E.ON, UK
Click here to read more or leave a comment.
Marrying Two Facilities Engineering Cultures
George Cheriyan, TNK BP, Russia
Click here to read more or leave a comment.
Scale Removal from the Condensate Stripper at Kollsness
Baard Kaasa, Statoil, Norway
Click here to read more or leave a comment.
Shell GTL Technology – Making it Happen
Arend Hoek, Shell Global Solutions, The Netherlands
Click here to read more or leave a comment.
Techno–Economic Comparisons of Cooldown Options for LNG Import Terminals
Robert Brannock–TGE Gas Engineering
Click here to read more or leave a comment.