GPA EUROPE
Register Now!
GPA Europe Home
About GPA Europe
Contact GPA Europe
GPA Europe Events
Associated Events
GPA Europe Membership Info
GPA Europe Current Members
GPA Europe Library of Papers
GPA Publications
GPA Awards
Newsletter
My Details

forgotten your password?
Username
Password
GPA Worldwide  

GPA USA
GPA
Middle East
GPA
Canada
GPA
Venezuela
1999
 
The following lists the meetings and presentations arranged in 1999. Where papers are marked with an asterisk (*) the author(s)/presenter did not provide complete papers. The Aungier Award was not presented due to a lack of suitable candidates.

19th February - Challenges in Developing LNG Projects
  1. Prospects for the Development of the LNG Market. by G. Maisonnier, Cedigaz.
  2. Commercialisation of Stranded Gas.
    by M.W. McEwan, G.Ellison, A. Punt and R.K. Nagelvoort, Shell Global Solutions.
  3. LNG Two-Phase Heat Exchange.
    by S.P.B. Lemmers, H.J. van der Ploeg and F.F. de la Vega, Fluor Daniel.
  4. LNG Terminal Development - Case Studies. by W.M. Ventham and J.K. Bhattacharyya, M W Kellogg Limited.
  5. * Interests in Offshore LNG Receiving Terminals. by J-L. Pairon, Tractebel Industrie.
  6. *  Qatargas Start-up.
    by C. Thomas, Total.
  7. *  Analysis of LNG Liquefier Process Cycle Efficiency for Optimal Design.
    by Y-N. Liu and J. Solomon, Air Products and Chemicals Inc.
  8. Influence of Design Parameters and Process Selection on LNG Base Load Energy Consumption.
    by H. Paradowski, Technip.
  9. New Trends in LNG Process Design.
    by B. Fischer, A. Rojey and C. Streicher, Institut Français du Pétrole
    and E. Flesch, J.C. Raillard and T. Burin des Roziers, Gaz de France.
  10. Small Scale LNG Plant Cost Reduction Study. by C. Aitken and P.J. Nuttall, BP Amoco plc.


16th April - Keynote Speech

  1. * Facing the Challenge: Securing the Future for Gas in the UK. by T. Botts, Gas Director, Shell UK Exploration & Production.


20th May - Spring Meeting, Airth by Falkirk (Grangemouth).

  1. * Forties Pipeline System - Past, Present and Future.
    by S. James, BP Amoco plc.
  2. Retrograde Gas Condensate Production from the Brae Bravo Platform. by S.A.G. Abel, Marathon Oil U.K.
  3. A Herons Eye View of ETAP.
    by P.J. Smy, Shell U.K. Exploration and Production.
  4. Design, Operation and Optimisation of Primary Separation Facilities. by K. Hart, Amerada Hess Limited.
  5. The Britannia Development, Commissioning and Early Operating Experience. by P. Wingate, Britannia Operator Limited.
  6. Challenges of Offshore Commercial Gas Processing on I-I P/HT Elgin/Franklin Facility.
    by D. Madlani and J-P. Lillo, Elf Exploration UK plc.
  7. * Printed Circuit Heat Exchangers - Operational Considerations. by A.M. Johnston, Heatric.
    N.B. for extensive details of this presentation see Budapest Conference 1999.
  8. Armada Commissioning and First Year Operation.
    by R.A. Haugh, BG International Limited.
  9. * Forties Pipeline System Terminal - An Operator's Perspective. by G. Brown, BP Amoco plc.


17th November - Power from Gas

  1. Some Commercial Aspects of Power Generation from Natural Gas.
    by J. S. Curran, Eastern Generation plc.
  2. Environmental Considerations in the Design of a U.K. Power Plant. by M. Healy and G. Wilson, Costain Oil, Gas and Process Limited.
Go to 1998
Go to 1998
Go to 2000
Go to 2000
©Copyright GPA Europe 2006            Homel  About GPA Europe l Contact Us l Europe Events l Associated Events l Membership Info
Designed and Powered by
Acorn Ecommerce