Skip to main content

Simultaneously Improving Integrity and Reducing Cost on a BP Gas Terminal

Dave Burgess, ABB Engineering Services, UK

The paper is based on a real case study at a BP European Gas Terminal, where integrity and financial benefits were gained concurrently from the use of Risk-Based Inspection methodology and reviews for pressure systems on the site. The benefits include: - Clearer understanding of the process operation and likely influence on equipment deterioration - Focussing inspection on credible deterioration mechanisms, thus reducing examination activities - Optimising examination methods and improving plant reliability, so as to reduce overall inspection costs.

In periods of escalating inflation and resource scarcity, reducing the overall inspection requirements enabled the site to reduce overall cost, increase uptime and provide stakeholders improved assurance on asset condition.

LogIn Required

Register or Log In

Please sign into your account before placing an order on our website.

User registration enables us to offer GPA Members discounts and to ensure you have a valid email address.

Your account details, content purchases, registrations and a record of your previous orders are accessible from your account.

Past Paper Download

Past Paper Download
Price
£50.00
Variations
Currency Selection

My Licences

You have not purchased any GPA Europe Membership yet. Visit our Membership area to select the Membership that is right for you and checkout.